你好!欢迎光临北京中仪友信科技有限公司!已注册[登录] 新用户[免费注册]
免费销售电话
就是要仪器网>>产品中心>>建筑工程及物探>>腐蚀控制产品>>绝缘子及密封>>

TY10PSI第二套管垫片ZX21

TY10

PSI第二套管垫片

ZX21
PSI第二套管垫片
订 货 号:ZY351298 品    牌:英国密析尔MICHELL 产    地:英国 市 场 价: 折 扣 价: 发货周期:现货或5天内
加入购物车 支付宝购买 询价留言
分享到:分享到搜狐微博 分享给QQ好友 分享到爱分享 分享到白社会 分享到开心网 分享到人人网 分享到豆瓣 分享仪器
产品描述技术方案相关仪器最新上架商品咨询使用评价
Features
All non-metallic. No nuts, bolts, washers or any other metal parts to corrode or degrade over time.
Designed for carrier pipe diameters from 0.83 (21 mm) to 37.60" (955mm) in diameter.
Segmented pieces - small inventory may be used to accommodate a large variety of pipe styles, types and diameters. No extra trips from job site to warehouse for additional parts.
Easy assembly. Simply slide the segments together and ratchet tight with the patented Slide-Lock connecting system.
Wide variety of runner heights to allow numerous options for pipe positioning within the casing.
Runner variations may be used to adjust for grade.
Manufactured from UV resistant polymer.
High impact strength, 1.5 ft. Ibs./square inch (10.34kPa)
Excellent compressive strength, 3, 000 Ibs./square inch (211 kg/square cm)
Wide temperature range, -40° to + 180° F. (-40° to +90° C.)
Eliminates sand or grout fill.
No special tools required for installation.
Low coefficient of friction for ease of installation.
Will accommodate small conduit attachment for communications or electrical cable.
Illustrated above: Based on 20 (6.1 M) carrier pipe segments in a casing of not more than 300 (91.5 m). Consult Corrosion Control Products Company for longer casings and for concrete pipe. Use 2 spacers/length of pipe for 13 (4.0  m) sewer pipe segments.
Installation
Component Parts - Installation
Separate segments are connected by inserting the buckles into slots on the adjacent segment.
A. Buckles with angled ratchet nubs.
B. Slots accept buckles and hold segment in position around pipe in preparation for final tightening.
C. Slot accepts Slide-Lock. Arrow molded on seg­ment indicates correct insertion direction.
D. Runners are available in a variety of heights to allow for desired carrier pipe placement in casing.
E. Slide-Lock is used to ten­sion the segments together after installation on pipe. Channels face up during insertion while the correct size slide-lock (micro, mini, midi, maxi) is molded on the flat (bot­tom) side.
F. Slide-Lock is inserted into channel to close and lock the segments together. Slide-Lock removal and re-insertion will ratchet the segments together for final tightening against carrier pipe.
Installation Tips
As with any installation process, it is important to wear appropriate eye and personal protection. This is even more important if installation work must be done at low temperatures.
It can be beneficial to place the Ranger II segments and Slide-Locks in a warm environment while awaiting installation in colder climates.
During the installation process, no matter what the temperature, it is essential that the Slide-Locks be supported by the carrier pipe to eliminate the possi­bility of bending the Slide-Locks during insertion.
Under hot installation conditions, it is better to allow the product to age a couple of hours at ambient temperature prior to assembly.
Illustrated Installation Procedure
   
 
1. Size the Ranger II to make sure you have all the segments and Slide Locks.
2. Take the segments and align the buckles. Insert the buckles 1/4 of the way in to the slots.
3. Locate directional arrow on segment and insert Slide Lock until it tips out the end of the segment.
4. Continue the process from the previous steps until all segments are put together. You are now ready to wrap the Ranger II around the pipe.
5. Align the buckles into place. Take the final Slide Lock and slide completely into place.
6. Insert all Slide Locks as far as possible by hand. Complete tightening by lightly tapping each Slide Lock with a light rubber headed hammer.
7a. To tighten Ranger II secure to carrier pipe, back Slide Lock completely out of slot. If needed, push segments together by hand.
7b. Reinsert Slide Locks completely into segment by lightly tapping Slide Lock back into position.
8. Continue steps 7a and 7b until Ranger II is secure against
购买提示  

PSI第二套管垫片

购买提示

1.阁下有任何产品问题请致电400-663-9117.
2.中仪将提供北京、上海、深圳、南京、重庆送货上门服务.
3.我们提供PSI第二套管垫片计量送检,在签收前请详细核查资料信息.
4.TY10PSI第二套管垫片价格根据配置和货期不同而不同,具体以合同为准.
5.我们为阁下提供保修TY10PSI第二套管垫片售后维修服务,提供后期技术支持.
6.阁下对TY10PSI第二套管垫片使用方法等有需求时,将为阁下找到PSI第二套管垫片说明书.
最近浏览

英国密析尔MICHELLPSI第二套管垫片

代理商厂商品牌售后维修区域:北京-上海-浙江-广东-河南-杭州-郑州-广州-深圳-佛山-惠州-厦门-汕头-台湾-香港-天津-西安-宝鸡-杭州-温州-常州-无锡-苏州-南京-镇江-扬州-南通-合肥-徐州-常熟-石家庄-太原-呼和浩特-沈阳-长春-哈尔滨-南京-合肥-福州-南昌-济南-郑州-武汉-长沙-广州-南宁-海口-成都-贵阳-昆明-拉萨-西安-兰州-西宁-银川-乌鲁木齐-杭州-沈阳-长春-哈尔滨-济南-武汉-广州-南宁-成都-西安-大连-宁波-厦门-青岛-深圳-杭州-淮安-连云港-昆山-嘉兴-湖州-秦皇岛-邯郸-邢台-保定-张家口-承德-廊坊-呼和浩特-包头-鞍山-大庆-锦州-铁岭-盘锦-湛江-萧山-辽宁-淄博-宁夏-绵阳-云南-朝阳-陕西-青海-北海-唐山-吉林-苏州-昆山-无锡-镇江-常州-连云港-淮安-淮阴-盐城-扬州-徐州-宜兴-江阴-南通-扬州-上海-滁州-内蒙古-新疆有销售.北京亦庄开发区,天津滨海开发区,秦皇岛经济开发区,太原经济开发区,呼和浩特经济开发区,沈阳经济开发区,营口经济开发区,大连经济开发区,长春经济开发区,哈尔滨经济开发区,虹桥经济开发区,漕河泾开发区,连云港开发区,南通开发区,昆山开发区,南京开发区,杭州开发区,萧山开发区,温州开发区,宁波开发区,芜湖开发区,合肥开发区,福州开发区,福清融侨开发区,东山开发区,南昌开发区,威海开发区,烟台开发区,青岛开发区,郑州开发区,武汉开发区,长沙开发区,萝岗区开发区,广州南沙开发区,惠州大亚湾开发区,湛江开发区,南宁开发区,重庆开发区,成都开发区,贵阳开发区,昆明开发区,拉萨开发区,西安开发区,兰州开发区,西宁开发区,银川开发区,乌鲁木齐开发区,石河子开发区,金桥出口加工区,苏州工业园,宁波大榭开发区,厦门海沧投资区,海南洋浦开发区。

按字母分类: A| B| C| D| E| F| G| H| I| J| K| L| M| N| O| P| Q| R| S| T| U| V| W| X| Y| Z| 热门一| 热门二| 热门三| 热门四| 热门五|


中仪主页联系中仪了解中仪版权声明友情链接站点地图广告服务
CopyRight 2003年创立  版权所有  MRO工业品就是要仪器网
(5)
产品对比产品对比 隐藏对比框
对不起,您还没有选择产品
开始对比清 空